When The Going Gets Tough, The Tough Get Going

O&W Historical Relic
It has been spoken, that how one deals with adversity defines the metal of the man (or woman), and in the past several weeks, and more specifically the last two weeks, our Sullivan Renaissance Project here in Mountaindale has faced a great deal of adversity through no fault of our own...it is what it is, and comes with the territory as they say.  Couple that adversity with the monsoon weather we have been getting, and our project is behind schedule.  

"Have no fear, UNDERDOG is here"...I know, dating myself again.

It is pouring down rain again today, and I do mean pouring, so spending my day catching up on all the office work that a project like this entails, and making a great deal of progress, as I wait on the letter from the Town of Fallsburg and Sullivan Renaissance which will clarify certain areas of our project that are in dispute.  We will simply go with the flow, and make whatever necessary adjustments need to be made, and who knows, in some aspects, it could work out even better.

1.  It looks like the landscaping at the entryway is going to be negatively impacted, and so we are already busy with alternative plans.  Rather than give away the opportunity to make a bold vision statement at the entryway, it is the projects intention to simply revamp, redraw our plans, and simply make a beautiful entry way on the inside of the posts that signify the gateway entrance, thus abiding by the terms of the newly draw deliverable s, while at the same time being true to the original artistic statement of the project.

2.  Work was started (on our one dry day) in earnest at the location of our first historic element, and if we can catch a break in the weather (Sunday and Monday), look for some WOW FACTOR to start creeping into the project area as soon as next week...this will be an EXCITING time for us on the committee, and for our intern.

3.  Arrangements were made this week to do a big volunteer day with the local Girl Scouts which will involve two troops, so very excited to have the opportunity to be working with them again on this year's project. 

4.  Clearing and clean up of the project area is almost done, and if we can get a few days of sun so that the area dries out, that portion of the project can be crossed off of our list.

5.  We are really excited that the GREEN ASPECTS of this project are pulling together as nicely as they are. It was our intention to use as much reclaimed materials in the project area as possible, and with a few very GENEROUS DONATIONS from people, pleased to announce that about 85 percent of the sculptural interpretation of the 33 Steam Locomotive will be constructed with recycled lumber and materials.

*CURIOUS...does any one have an old 6"-8" bell they are looking to get rid of?

6.  We have our barrels, and thanks to Raymon Elozua kind offer to use his welding equipment, we hope to get said barrels welded, and construction started on the train this upcoming week.

7.  Our fund raising plans are still in FLUX, though we have so far been very fortunate in receiving a lot of in kind donations.

So, we are digging in, and getting down to the tasks at hand, and hope to have a few more great photos to share next week...the one at the top of this articles is the beginning stages of work on our first historical element on the trail.


Thursday, April 28, 2011

2011 Mountaindale Sullivan Renaissance Phase 1 Guide

Dear Mountaindale Community Stakeholders:

Please find attached to this letter a copy of the “2011 Renaissance Category B Project Implementation Guide Phase 1” document which outlines our goals and needs from now through May 14th, 2011 as we gear up for this year’s Renaissance project. Please review the document, share it with friends and family, and feel free to call me (845)693-4513 with any questions, suggestions that you might have. We are looking for volunteers and donors, and hope we can count on your support in making this year’s Sullivan Renaissance Project a grand success that Mountaindale and our neighbors are very proud of.

As we move forward, you can stay abreast of the project, and keep up on news and events for our community by visiting http://mountaindalenews.blogspot.com/ or our Mountaindale Renaissance Blog at http://2011mountaindalerenaissanceproject.blogspot.com/. The attached document has been posted on our Renaissance Blog to make it easier for all stakeholders to share/read the materials.

I look forward to meeting many of the people in town I have yet to meet, and looking very forward to working WITH ALL OF YOU in making our 2011 Mountaindale Renaissance Project a great success, and wonderful addition to our “Rails to Trails” corridor.

Sincerely,

Sherwood Martinelli
Committee Chair-2011 Renaissance Project

2011 Renaissance Category B Project Implementation Guide Phase 1
Mountaindale Community Development Project has received a grant from the Sullivan Renaissance for the purpose of implementing improvements and beautification in the area known as the “Rails to Trails” corridor here in our local community.  To facilitate the completion of our goals, the Renaissance Committee’s core group has put together this implementation guide where in we describe the tools, citizen involvement and tasks needing to be accomplish for successful conclusion of our multi-phase project in a timely fashion.
Citizen Involvement-Volunteers
First, we are pleased we our off to such a great start with our volunteer efforts this year.  We have already had the help of our local Girl Scouts in doing trail head cleaning in the area of our 2011 project.  April 30th is a Community Involvement Day with commitments from both local citizens and business to help in doing maintenance/cleanup/staging work related to past Renaissance Projects, as well as helping in further pre-project tasks for this year’s project.  A special thanks to all those involved.
We are looking for some individuals or local businesses willing to step forward to chair two sub-committees for this year’s project, so if you are interested in chairing either of these sub-committees, please contact Committee Chair Sherwood Martinelli at (845)693-4513 or Barb Schmitt at (845)434-4747 for additional details and information.
Volunteer Recruitment and Coordination-The duties of this committee will include local/extended committee outreach to individuals, businesses and civic groups seeking volunteers, and then scheduling those man/woman hour commitments into the project calendar so that we provide our volunteers with a worthwhile and memorable experience as participants in our projects.  As committee chair, you will have the freedom to put together, build your own team, drawing on those already involved, and/or bringing in new members to join the team.
Fund Raising Coordination-The duties of this committee will include local/extended committee outreach to individuals, businesses and civic groups seeking donations of cash, goods and/or in kind services.  Additionally, working with the full Committee, this sub-committees duties and responsibility will include the creation, planning and implementation of various fund raising events here in the Mountaindale Community.  As committee chair, you will have the freedom to put together, build your own team, drawing on those already involved, and/or bringing in new members to join the team.  Our goal this year is too A) involve our community (both local and extended) in finding/having donated most of the building materials for our sculptural installation, as well as raising enough money to not only cover the cost of installation, but to have money banked for long term maintenance/repair/improvement of this project over an extended period of time.  (IE-additional plantings, bulbs, replacement plants, fresh mulch)
Volunteer/Fund Raising Goals
Volunteers-Our goal is to simple…through community reach out, and creative thinking A) involve as many people as we can in our Renaissance Project, and B) include as participants as many civic and business groups as we can.  Volunteers and the retention of them once found is key to the success of any civic project.  We want volunteering in Mountaindale to be a fun memorable experience, the kind of experience that sees groups and individuals calling us to find out when they can come HELP AGAIN.
Of special need this year…there is going to be a lot of hard physical work involved in this year’s project, as well as some tasks that require some skilled tradesmen. 
Fund Raising Goals
Fund raising is divided into two specific areas of need.  First is an actual cash donation from private/public/civic donations.  Our goal benchmark for this year is $5,000.  This would allow us to successfully complete this year’s project, and have money set aside for future enhancements…as example, though not included in our Project Plan; we would like this fall to do some spring bulb naturalization in the project area, thus adding another bloom season.  IT is estimated that securing these spring time bulbs will carry a cost of $750.00 The second area of fund raising is the actual donation of goods or services…in this area, it is possible for the two committees to dovetail one another as businesses step forward to donate their skills to the process as an in-kind donation of services.  Below is a list of some (but not all) of the goods we are looking for this year.
Seeking Donation of Goods
Ornamental Flowering Trees-Trees of any size get very expensive very fast, but they also not only make a beautiful statement in a landscape, but they also help to anchor it.  Our plans call for seven of these trees.
Planting Materials…bulbs, scrubs, bushes, perennials, annuals of ALL KINDS, though we do have a particular list of MOST NEEDED PLANTS.
Top Soil-It is estimated that this year’s project needs 12 yards of HIGH QUALITY top soil (not fill).  We have secured two prices on this…we can get delivered, a total of 16 yards (four more than we will probably need) for $575.  If we have a way of picking up the top soil ourselves, the price is $28 per yard…a very significant savings.  A local business could donate the costs of the top soil; offer an in kind donation of pickup and delivery of the material, or both.
Lumber-we are in need of some lumber for building the skeletal bones of this project.  These materials can be (preferred actually) weathered.  If you are in construction and have old lumber you would like to donate to our project, please contact Sherwood at (845)693-4513.  Treated lumber would be idea, but not mandatory.  We have need of 2x4’s, 2x6’s, 2x12’s, 6x6 landscaping timbers, as well as several sheets of plywood.
As a subset of this…do you have 16 common nails, some number 8’s, and some 3-5 inch screws that maybe got rusted, cannot be used on a commercial/residential project, but would be perfect for a project like this out in nature?  We would love to have them.  Also, looking for a spool or two of wire that could be used to bind/twine elements together.
Old piping that could be used to turn the sculpture into a rain water collection and watering system for the garden.
30 and 55 gallon drums.
Birch branches, poles…these will be used as sculptural highlights.
Field Stone…self explanatory.
Large…I MEAN LARGE landscaping stones.  WE are looking for some statement pieces.

Project Priorities-Staging This Year’s Project-This year’s project includes three main elements.  Clean, rejuvenation and enhancement of the “Rails to Trails”, creation of a small landscaping element to showcase a historical relic from the old O&W Railway, as well as a major landscaping element (including the building of a significant sculptural element) in a historical location, and including therein a second historical element.
Pre-Project Clean Up and Staging
1.       Using florescent construction tape (pink and orange) mark off the area of the project.  Orange tape to define the area, pink tape marking trees/debris to be removed from the area.
2.      Working with the town of Fallsburg, clean up the woods and trail area for the project.  This will include thinning of woods to promote better tree growth, clean up of woodland and train floor.  Some grading work also needs to be accomplished, either with the town of Fallsburg, or using our own equipment and labor here in the hamlet.
3.      Find/Define materials staging area.  Begin task of gathering, finding and/or purchasing necessary materials to build the train.  Start pricing out plant materials needed for the project.
4.      Using spray paint, layout the project footprints so that these areas can be further shaped, defined and sculpted.
5.      Move/Transplant the large spruce to its new location.
*On-site meeting is scheduled for week of 2nd with Henry from the town of Fallsburg to find out what they will be able to assist us with.
**Additional leg work needs to be done to track down and get some kind of commitments on access to water…Ken is handling this.
*** Verify with Raymon his commitment to be available for welding work…furthermore, discuss with him best practices for turning the four barrels into a water collection/storage and disbursing system so that our sculptural element is also a rain garden.

Target Goal for completion of Phase one goals as outlined above is May 14th, 2011.
Please feel free to add your comments or suggestions to this plan by emailing Sherwood at marcwoodsocialimaging@gmail.com or calling me directly at (845) 693-4513

Monday, April 25, 2011

Sullivan Renaissance Press Release-THE REAL DIRT ON SMART GARDENING

THE REAL DIRT ON SMART GARDENING
Working Smarter to Create Gardens with the "WOW FACTOR"

[FERNDALE] – Want more color and variety in your garden, but not sure what to plant where? Horticulturalist Vivian Multari-Ginsberg will discuss plant choices and flower combinations to help achieve beautiful, sustainable gardens with the “wow factor.”

Want to work smarter this year?  Gardening expert Mary Lewis will demonstrate cool tools and explain time tested tricks to make gardening time more fun.

Sullivan Renaissance is holding its spring gardening seminar entitled “The Real Dirt on Smart Gardening” on Wednesday, May 4 at 7:00 p.m. at the CVI Center in Ferndale. 

Bring your enthusiasm and questions!  There will be time to answer specific questions.
Pre-registration is requested.  Refreshments will be provided.  For more information or to register, contact Sullivan Renaissance at http://www.sullivanrenaissance.org/ or 845-295-2445.

Sullivan Renaissance is a beautification and community development program principally funded by the Gerry Foundation.  Sponsors include Bold Gold Media Group/Thunder 102, Sullivan County Democrat, The River Reporter and WSUL/WVOS.

Catching Up, Laying Ground Work For Spring and Summer

Sure those following visiting this blog have wondered, "What happened to Sherwood?"  Well, I have been busy with various things, including working  behind the scenes as we prepare our official launch of this years Renaissance Project on our segment of the "Rails To Trails".  That said, has been a lot of things going on, and thought it time to update everyone...though some updates have already appeared in Mountaindale NY News.  Shall paste those three articles here so you can bring yourselves up to date.

First article announced the fact that the Mountaindale Community Development Project was successful with their grant application!  A special thanks to some of our local businesses (My Radiant Yoga, Diversified Realty, Upstate Karate) for being such a source of support and knowledge. The Sullivan Renaissance Spring Conference was well attended, and the guest speaker, Katy Moss Warner was insipirational...you should visit America In Bloom.

Breaking News...Mountaindale Awarded Grant To Build Train Locomotive!

In BIG Breaking News for our hamlet, we have just learned that the Mountaindale Community Development Project (MCDP) has been awarded a $1500 Community Beautification Grant from the Sullivan Renaissance. The formal announcement and awards presentation will be this Thursday night.


SPRING FORUM & GRANT AWARDS 7:00 pm CVI Building, Ferndale, NY
Sullivan Renaissance (845) 295-2445 This year's Mountaindale Beautification Project will be centered around and in our connection spur to the "Rails to Trails" bike path. The primary elements will include enhancement of the entrance area, as well as a new garden spot that will feature a half size re-creation (artistically) of the O&W's old 33 steam locomotive. It should be a lot of fun, and there are going to be lots of opportunities for volunteers to get involved and get your hands dirty. For information, or to find out about volunteer opportunities for yourself or organization, please get in touch with Sherwood at (845)693-4513.
 
Next up...two Saturdays ago, we actually had our FIRST Sullivan Renaissance Project Volunteers working on a cold, overcast and blustery April day...WHAT FUN.  I would like to extend a very special thanks to the girls and troop leaders from Fallsburg's Troops 738 and 580.
 

Fallsburg Girl Scout Troops 738 and 580 Earn Spirit Day Badges

Looking out the window of my apartment here in Mountaindale at the cold, overcast, blustery sky as I sipped my morning coffee early this morning, I was wondering if the planned Volunteer kick iffevent for our 2011 Sullivan Renaissance Project would need to be canceled. It was under forty degrees, and the sky was threatening rain at any moment...as I contemplated this thought the phone rang...it was one of the Girl Scout Leaders letting me know they were planning on being out front of 62 Main Street at 11 O'clock sharp, informing me that the girls were really excited about the chance to be the first volunteers for this years project, which is located inside the entrance to our "Rails to Trails Corridor. Pouring my second cup of coffee I went in search of a HEAVY COAT.


As promised, the three Scout Leaders arrived right on time, charges in tow, full of energy, and excited to get started on doing some trail clean up in the area of our project, so one large wheel barrel wagon and a rake in hand, we all set off for the walk over to the trail head to get started. On the walk over, everyone introduced themselves. Gina Marie Colombo, Donna Lent, and Jennifer Simms were the three Scout Leaders, and as we walked I found out that this was a special day for the girls, as it was "Girl Scout Spirit Day" and the four girls would be earning their Spirit Day badges as a part of their community service work on this day..."How cool is that?" Even better, the theme of this year's Girl Scout Spirit Day as the Girl Scouts celebrate their 100 Year Anniversary is, "Forever Green." What better project could there be for the theme "Forever Green" than doing trail cleaning on a bike path in the "Rails to Trails Corridor" here in our small hamlet? The four girls were ready to work, full of more energy than I was able to muster at eleven in the morning on a almost wintry day, but being around them would get even the most hardened of souls in a great mood, and soon I found myself smiling ear to ear at their zest for the task at hand. Where does all that energy come from, and could I have a bit of it? There was Kaitlyn Simms, dressed in a hot pink jacket, who had on the greatest winter hat. Arianna Gonzalez, the youngest member of our troupe was wearing a vivid purple winter coat, had on a pastel striped hat with a pom pom you could not miss, and she had dug into her own piggy bank to purchase a box of Tagalong peanut butter patties so we had snacks to eat as we worked. There was Madison Lent with her off white fishing hat on, and rounding out the group was Brittany Lent in a pink hat featuring Sponge Bob Square Pants on it...yes, we were quite the sight as we strolled down Main Street pulling along behind us our big yellow wagon as we made our way to the Entrance way of "Rails to Trails." The next couple of hours were a LOT OF FUN as the girls raked up leaves, and began picking up branches and limbs that had fallen onto the trail over the long winter. The Mountaindale Community Development Project wants to thank the members of Troops 738 and 580 and their leaders for stepping up so early in our 2011 Sullivan Renaissance Project, for lending us a hand as we begin our pre-project clean up of the area in which we will be working this spring and summer. Everyone involved had a great time, and I would like to thank the troop for awarding me an "Honorary Girl Scout Spirit Day" badge, the icing on what turned out to be a beautiful day to be out in the woods doing trail clean up on our "Rails to Trails Corridor" here in Mountaindale.

Very excited about our project this year, and for those of you who have not heard yet, we are going to build a sculptural interpretation of the O&W Railway's old number 33 Steam Locomotive, and we could not have asked for a better official kick off to this year's event than having the Girl Scouts here in town to lend us their support. Their hard work today cleared off a nice patch of the trail we are going to be projecting in. If you or your organization would like to be involved in this year's project, or would like to schedule a day to volunteer, we would love to have you. Just give Barb a call at (845) 434-4747 or contact our Committee Chair Sherwood (that would be me...) at (845) 693-4513. My answering machine is on 24/7 so if I am not in, please leave me a message, and will get right back to you.

Saturday, March 19, 2011

Sullivan Renaissance Project Plans Coming Down Home Stretch...Input Still Being Accepted

 Greetings Residents:

As our plans for this years 2011 Renaissance Project get closer to submission, thought it a good idea to post the general outline of everything here on this blog.  If you have any questions, please give Sherwood a call at (845) 693-4513.  Deadline is fast approaching as everything has to be submitted to the Sullivan Renaissance folks no later than Wednesday March 23rd.

Mountaindale Community Development Project (MCDP) 2011 Sullivan Renaissance Project-Grant Proposal Information Sheet/Project Guide

Our goal in this years proposed project is multifaceted, and touches on some keystone areas of our community which need to be enhanced and better presented…our specific area, in which we will be making significant improvements, is the area known and identified as the “Mountaindale Rails too Trails” wherein we will be doing two large projects, and two smaller ones.

Sign enhancement and beautification of the Rails too Trails entrance-it is our goal here to improve upon work done in previous years by rearranging some of the landscaping elements (IE-moving a spruce), and adding additional elements to the area to enhance the pre-existing signage, and make the entrance to the Mountaindale Rails too Trails really stand out.  Existing flower boxes which were built and installed by the city of Fallsburg will be replanted, and additional landscaping elements added as more clearly delineated in drawing titled, “Rails To Trails Entrance.

With the first two hundred or so feet of Mountaindale’s Rails too Trails are several historical elements we wish to emphasis by incorporating them as a part of the bones of one large, and two smaller projects.  The first of these historical bones from days long gone is an original O&W Mounting Block…we will be clearly the ground around this old concrete block, adding some taller landscaping materials behind it, then letting the block itself act as a back drop for shorter bedding plants which will be arranged in front of it.

Our Third Project involves two O&W Railways elements…the first is an old O&W Battery box (40”x52”) which will be cleaned out and turned into a planter as a part of the larger part of this project.  The second O&W element here is the actual location…we will be working in what was the Mountaindale Siding where cars were placed for temporary storage and/or unloading…the lumberyard routinely had cars left there for a period of time to be unloaded, the goods moved over the rails and down to the lumber yard site located opposite the siding.

This area is going to be cleaned up significantly, and after prep work is completed (we have opened discussion with the town of Fallsburg to get help in grooming of this area, as well as in the task of brush removal)  we will be using (as much as possible) items from nature, and found goods (IE…four 55 gallon drums) to construct a sculptural interpretation of an old O&W Locomotive (said locomotive will be built at close to half scale).  Said sculptural element will bear a resemblance to the old number 33, which is significant in that said Locomotive and its train cars crashed at the exact location of our new train station here in town back in 1904.  Once the sculptural element is built, it will receive numerous landscaping additions as can be more fully understood in the drawing titled, “Montaindale Renaissance Main Project”.


One of the interesting goals of this project from an environmental stand point is our plan to use the 55 gallon drums used to recreate the steam producing section of the locomotive as a rain water collection and storage facility, thus allowing us to water much of the project with water collected from nature, rather than relying upon water carted in, or hosed in…we have made inquiries about the possibility of accessing water from the well/pump house which located across the road from the entrance to Rails Too Trails.


The last location we will be working with for 2011 is another O&W element located some 50 up the bike path from the locomotive and on the opposite side of the bike path.  It was one of the blocks used to mount up switching lights and the like.  We plan on placing barrels here, beautifying the area, and turning it into a collection point for both litter and recyclables that those using the trail are looking to dispose of.  We will be moving signage that is currently mounted to a tree to this area.  Three cans will be painted and labels and placed here for this purpose, holes drilled into the bottoms of said cans to allow rain water to train out. 

Lady Bird Johnson Wildflower Center-Species Identification Resource
http://www.wildflower.org/collections/collection.php?collection=NY
Fiddle Head Creek
http://www.fiddleheadcreek.com/
Mountain Valley Growers
http://www.mountainvalleygrowers.com/mvv2-94.htm

Native Plants…Plants being considered:
What plants we will be considering too some degree will depend on A) Budgetary restraints as the project unfolds, B) changing light conditions as we clear out and thin the surrounding woodland area around the main project area.  It is our goal to include as much as possible native plants to our area…to accomplish this goal, some considerable time was spent looking for a fairly comprehensive list of plants native to our area, and the inventory list from Fiddle Head Creek (which specializes in native New York plants, as well as plants specific to the Adirondacks) provided us with a good model list from which to work from.   Said list is copied below, and where possible, selections from this list based upon availability from our local nurseries will be used in making our final plant selections, and as these native species are added into the project, our original plant list will be supplemented to reflect these more appropriate selections in the landscape plan.
Rails Too Trails Entrance…Plant Inventory

A) Ornamental/Native Grasses  (6)  The types chosen depend a lot of local availability.  Purple Moor Grass, Japanese Silver Grass (nice fall bloom), or Northern Sea Oats (seeds heads and bronze foliage provide excellent winter visual interest) would be varieties considered.  All three of these are multi-zone (4-8) grasses that would do well in our garden plans.

B)  Ornamental Tree (1) Considering the Eastern Red Bud.  It grows well in full sun, or in partial shade,  flourishes in zones 4-9, and provides multiple season eye appeal with it’s blooms in spring, and changing leaf colors.   George Washington spent a great deal of time uprooting this tree from the local forest to transplant into his garden if rumor is too be believed.

C)  Butterfly Bush (Buddleia) (2) These will flank either side of the currently existing sign located in the entrance area, chosen for their ability to draw in the hummingbirds which Mountaindale is so well known for, as well as acting as a magnet for butterflies.  This selection will act as a great anchor on either side of the sign, and should begin blooming about a month after the Eastern Red Bud has lost it’s spring blooms, thus providing an additional flowering element for the summer season, and bringing movement and sound into this area as the visitors arrive, or perhaps settle onto one of the two benches for a break before traveling further down the Rails Too Trails path.  This is a Zone 5 selection that will grow in full too partial sun, so is well selected for the area, and requires low maintenance once established.

D)  Dwarf Lilacs (2) This is supposedly a Zone 3 plant, however I have had very good luck in having them adapt too and florish in Zone 5 landscaping projects, including at my own home in Peekskill NY.  This selection is made for several reasons.  First, the bushes bloom at a young age, and the blooms are long lasting.  Secondly, the scent is a wonderful tease to the senses, and the leaves of this bush are very resistant to disease.  They do well in full sun, or partial shade, and once established do not have to be watered.

E)  Landscaping Stones (2) Maintenance free,  do well in sun or shade, and require no water.

F)  Iris (2 Clumps ) We are looking to get these donated through taking rhizomes of various varietals that people in the community are letting us pinch stock from.

G)  Wild flower seed mix…please seed seed mix particulars.
Mountaindale Renaissance  Main Project

A) Ornamental/Native Grasses  (6)  The types chosen depend a lot of local availability.  Purple Moor Grass, Japanese Silver Grass (nice fall bloom), or Northern Sea Oats (seeds heads and bronze foliage provide excellent winter visual interest) would be varieties considered.  All three of these are multi-zone (4-8) grasses that would do well in our garden plans.

B)  Ornamental Tree (3) Considering the Eastern Red Bud or Flowering Dogwood (white).  Both grow well in full sun, or in partial shade,  flourishes in zones 4-9, and provides multiple season eye appeal.

C)  Butterfly Bush (Buddleia) (3) These will flank either side of the currently existing sign located in the entrance area, chosen for their ability to draw in the hummingbirds which Mountaindale is so well known for, as well as acting as a magnet for butterflies.  This selection will act as a great anchor on either side of the sign, and should begin blooming about a month after the Eastern Red Bud has lost it’s spring blooms, thus providing an additional flowering element for the summer season, and bringing movement and sound into this area as the visitors arrive, or perhaps settle onto one of the two benches for a break before traveling further down the Rails Too Trails path.  This is a Zone 5 selection that will grow in full too partial sun, so is well selected for the area, and requires low maintenance once established.

D)  Dwarf Lilacs (3) This is supposedly a Zone 3 plant, however I have had very good luck in having them adapt too and florish in Zone 5 landscaping projects, including at my own home in Peekskill NY.  This selection is made for several reasons.  First, the bushes bloom at a young age, and the blooms are long lasting.  Secondly, the scent is a wonderful tease to the senses, and the leaves of this bush are very resistant to disease.  They do well in full sun, or partial shade, and once established do not have to be watered.

E)  Landscaping Stones (1) Maintenance free,  do well in sun or shade, and require no water.

F)  Iris (2 Clumps ) We are looking to get these donated through taking rhizomes of various varietals that people in the community are letting us pinch stock from.  These will be used to soften/naturalize as available.

G)  Azaleas (3)

H)  Morning Glory Seeds…using a mixed variety of seeds from commercial seed company…already in house.

I)  Black Eyed Susan (7)   A Biennial, the Black Eyed Susan requires almost no maintenance, grows well in full sun, or partial shade along a woodland edge.  Though the plant dies back every two years, the pollination/seed process should allow this to be an ever blooming source of pleasure in the garden area.


Historical Mounting Block  Bedding Project

A)  Ornamental/Native Grasses  (3)  The types chosen depend a lot of local availability.  Purple Moor Grass, Japanese Silver Grass (nice fall bloom), or Northern Sea Oats (seeds heads and bronze foliage provide excellent winter visual interest) would be varieties considered.  All three of these are multi-zone (4-8) grasses that would do well in our garden plans.

C)  Butterfly Bush (Buddleia) (3) These will flank either side of the currently existing sign located in the entrance area, chosen for their ability to draw in the hummingbirds which Mountaindale is so well known for, as well as acting as a magnet for butterflies.  This selection will act as a great anchor on either side of the sign, and should begin blooming about a month after the Eastern Red Bud has lost it’s spring blooms, thus providing an additional flowering element for the summer season, and bringing movement and sound into this area as the visitors arrive, or perhaps settle onto one of the two benches for a break before traveling further down the Rails Too Trails path.  This is a Zone 5 selection that will grow in full too partial sun, so is well selected for the area, and requires low maintenance once established.

Wild Flower Seed Mixtures

Deer Resistant Wildflower Seed Mix
Fast Facts:
 50/50 Perennial/Annual Mix
Deer Resistant
Suitable for planting in all 50 states
Coverage is 2000 Square Foot per pound…we have one pound.

Seed Mix Includes: 
Yarrow (perennial), Columbine (perennial), Bachelor Button/Cornflower (Annual), Godetia (annual), Lance Leaf Coreopsis (perennial), Fox Glove (biennial), Purple Coneflower (perennial), California Poppy (annual), Blanket Flower (perennial), Candytuft (perennial), Lupine (perennial), Forget Me Not (perennial), Black Eyed Susan (Annual-self seeding)

*note…we have secured adequate enough seeds to do multiple plantings through the spring and summer, which should allow us to STRETCH the bloom.

Burst of Bloom Wildflower Mix
 
Fast Facts:
50/50 Perennial/Annual Mix
Will tolerate full sun, or part sun environments
Plant in all 50 states
Seed Coverage is 500 Square Feet per ¼ Pound, and we have 1 ¼ pounds of this seed.

Seed Mix Includes: 
Dwarf Bachelor Buttons/Cornflowers (annual), Baby’s Breath (annual), Tall Cornflower/Bachelor Buttons (annual), Red Corn Poppy (annual), Lance Leaf Coreopsis (annual), Shirley Poppy (annual), Cosmos (annual-reseeds if lucky), California Poppy (annual), Blanket Flower (perennial), Black Eyed Susan (biennial) Wild Lupine (perennial), Purple Coneflower (perennial), Russell Lupine (perennial), Plains Coreopsis (annual), Siberian Wall Flower (biennial), Blue Flax (annual), Scarlet Flax (annual), Drummond Fhlox (annual),  Sulfur Orange Cosmos (annual), Gloriosa Daisy (perennial)

Morning Glory Seed Mix (for growing up into the train)
 
Fast Facts:
50/50 Perennial/Annual Mix
Full Sun or Partial Shade
Plant in all 50 states
Seed coverage is 500 square feet per ¼ and we have ¼ pound of seeds.


Site Prep Work

The areas to be worked on this year require some preparation work before the landscaping and construction work can begin on the site.

Woodland clean up and debris removal.  

As you look at the entrance to the Rails too Trail area, the road gracefully curves off to the right, with a track of woods that has a width of around 75 feet which fronts the road.  It is our goal and plan to work with the town of Fallsburg to clean up this woodland area to a depth of about 150 feet, taking down scrub trees, thinning the woods, and pulling out much of the dead fall, as well as human dumped junk such as abandoned chairs.   This will first provided a much more groomed look, and secondly by thinning the woods, and cleaning up the ground, more native woodland plants should thrive because of the increased filtered light making it’s way down to the woodland floor.

Entrance Area to Rails too Trails

Again, we will clean up and carry out brush and garbage removal in this area on both sides of the trail going into said trail about 150 foot on both sides giving it a more manicured look.

A spruce tree that is now about eight foot tall will be located further up from it’s current location by about ten feet, thus nestling said tree up against the corner of a pre-existing chain link fence.  The already placed planting containers will be repaired, and freshly painted.

Areas for new landscaping will be prepared.  Additionally, while we have equipment there, it is hoped that we can pre-stage some landscaping stones close to where they will be needed, thus allowing us to use a spud bar latter on to move them into their final positions.

Main Project Area

Again, clean up and junk tree removal is planned to make room for our sculptural element.  Additionally, we would like to grade the area a bit to make the installation and landscaping project for this area less problematic.

One thought is to take some of the dead wood from the clean up of woodland area, and create a large pile of wood by the train to look as if there had been fuel at the ready for the locomotive…especially since the history of  the O&W had the crews carrying with them the necessary tools to go out into the woods when necessary to find fuel to keep the trains running.

Community Buy In/Involvement and Inclusion

We so far have involved the community in various ways as we seek both support and buy in for this project.  There have been two meetings for all interested parties, both of these publicly notified in both the Mountaindale News Blog, and the Mountaindale Renaissance Project Blog.

Our first meeting was well attended, and several of the suggestions from that roundtable discussion have been implemented into our forward vision.

Additionally, numerous private discussions and mini-meetings have been held with our local business owners such as Radiant Yoga, Upstate Karate, Mountaindale Inn and others with support expressed from each of these sources.

We have also presented our plans to the local O&W Railway Historical Society, and they are behind our project, and have offered to lend whatever assistance they can…this help has already included providing us with historical photographs and plans of the locomotives we are going to be using to model our own project after.

We are in contact with a local runners group, the Girl Scouts and other organizations as we work to line our volunteers for this year’s project.   We have tentative commitments from two sources for work days that will involve the children of the local area, and are considering a fund raising project that would be catered to the talents and skill sets of our kids under 16.

The 2011 Sullivan Renaissance Centerpiece…Creation of a Sculptural Interpretation of Engine 33 which wrecked here in Mountaindale back in 1904 at the location of our new Train Station.

After doing some historical research on the subject, our goal is too build a representative sculptural installation piece which will resemble old Engine 33 inside the entrance to Mountaindale‘s Rails too Trails at the location of the old siding which used to hold cars waiting to be off loaded by the lumber yard.  The location was chosen for it’s historical significance to our community, and Engine Number 33 is being used as a model, as that is the Locomotive involved in a spectacular train accident back in 1904 at the location of our newly built train station.

The train sculpture will be approximately half scale, with a finished length of around 20-22 feet and a height of around six feet tall.  The basic sculptural element will be created using treated lumber, refurbished 30 and 55 gallon drums, and 6x6 landscaping timbers which will be used for structural stability.  Dead wood and other found materials will be used to begin adding and creating detail on the train.  Current plans envision bending and strapping together small green saplings to create the train’s wheels, and fallen birch limbs will be used to build the front cowl and the side iron pieces that drove the locomotive.  The back cab area will be built in such a fashion as to allow for locked storage for small tools, hoses and other maintenance items such as watering buckets.

Four barrels will be welded together to create the primary steam canister of the train…envisioning cutting slots of drilling holds into the tops of the barrels which would then allow us to catch/collect rain water that could then be pulled off from said barrels as a means to meeting at least a part of our watering needs.  Additional barrels strategically places will be used to store water that will be carted in, unless we are able to secure permission to tap into the well/spring building located across the street from these projects…efforts are now under way to secure said permissions.  If granted, hose would be used to water the gardens on and as needed basis.